Get a Quote

Custom apparel

Custom Windbreakers, built to specification

Water-resistant nylon windbreaker production with technical trims, packable construction and full branding. Custom production for independent and established brands, with starting quantities from 50 units where project requirements allow.

Made to your specification

Custom Windbreakers for private-label brands

Starting quantities can be discussed from 50 units. Final pricing depends on fabric, colour, sizes, construction, decoration, labels and packaging.

50+MOQ per style
By designLead time quoted
XS–3XLor custom grading
DDP·DDUDelivery options

Est. 2021 · 1,000m² facility · 51-person team · 10,000 units/month

Custom Windbreakers custom apparel manufacturing options by SHENGDE

Shell direction

Nylon shells with matte or technical sheen finishes, water-resistant coatings and taped or sealed seams where specified.

Construction

Hood, cuffs, hem and zip details are developed against the spec; packable and lined options available.

Trims & branding

Custom zippers, drawcords, snaps, reflective piping and label sets can be specified.

Prototype review

Fit, movement and construction are approved on a sample before production planning.

MOQ50 pieces per style per colour
Reference lead timeSample: 15 days · Bulk: 25–35 days
Development reference

Custom Windbreakers specifications

Shell optionsNylon with matte or technical sheen finish
Water resistanceC0/C6 coating and sealed seams on request
ConstructionHooded, packable and lined directions
Size developmentXS–3XL or custom grading
Trim optionsCustom zips, drawcords, snaps and piping
Starting MOQFrom 50 units, confirmed after fabric review
Sample targetConfirmed after specification review

Final specifications, minimums and lead times are confirmed in your quotation and approved sample.

Buyer questions

Custom Windbreakers FAQ

Which fabrics can be used?

Nylon shells in matte or technical sheen finishes are the core direction; coatings and seam sealing can be added for water resistance.

Can the windbreaker be packable?

Yes — packable construction with a stow pocket can be developed against the specification.

Is a tech pack required?

A tech pack is preferred. Reference garments and clear drawings can also begin the development discussion.

What is the MOQ?

Projects can start from 50 units per style, subject to fabric, colour and trim requirements.

How long does sample development take?

Sample development typically takes 15 days after the specification, materials and artwork are reviewed. Complex designs or custom-developed materials may require additional time; the final schedule is confirmed in the quotation.

How long does bulk production take?

Bulk production typically takes 25–35 days after sample approval and production details are confirmed. The final schedule depends on the design, materials, processes and order quantity and is confirmed in the quotation.

What to include in your brief

Share reference images or a tech pack, target quantity, fabric or GSM, colour count, size range, artwork, labels, packaging, destination and required delivery date.