Get a Quote

Custom apparel

Custom Outerwear, built to specification

Custom jackets and outerwear developed around your silhouette, fabric, trim and functional requirements. Custom production for independent and established brands, with starting quantities from 50 units where project requirements allow.

Made to your specification

Custom Outerwear for private-label brands

Starting quantities can be discussed from 50 units. Final pricing depends on fabric, colour, sizes, construction, decoration, labels and packaging.

50+MOQ per style
By designLead time quoted
XS–3XLor custom grading
DDP·DDUDelivery options

Est. 2021 · 1,000m² facility · 51-person team · 10,000 units/month

Custom Outerwear custom apparel manufacturing options by SHENGDE

Product definition

Outerwear quotations require clear information about shell, lining, insulation, closures and construction.

Trim sourcing

Zippers, snaps, cords, labels and other trims are confirmed against the specification.

Prototype review

Sampling validates proportion, movement, construction and finishing before production planning.

Packing and delivery

Packaging and DDP or DDU delivery options can be included in project planning.

MOQ50 pieces per style per colour
Reference lead timeSample: 15 days · Bulk: 25–35 days
Development reference

Custom Outerwear specifications

Product typesCoach jackets, bombers and lightweight outerwear
Shell optionsCotton, nylon and polyester directions
ConstructionLined or unlined, subject to specification
Size developmentXS–3XL or custom grading
Trim optionsCustom zippers, snaps, cords and labels
Starting MOQConfirmed after material and trim review
Prototype reviewFit, movement and construction approval before bulk

Final specifications, minimums and lead times are confirmed in your quotation and approved sample.

Buyer questions

Custom Outerwear FAQ

Which outerwear styles can you develop?

We can review coach jackets, bombers and other light-to-midweight styles based on a complete specification.

Why is outerwear MOQ project-specific?

Shell, lining, insulation, zippers and other trims often have separate supplier minimums, so the order minimum is confirmed after review.

Is a tech pack required?

A tech pack is preferred. Reference garments and clear drawings can also be used to begin a development discussion.

How is bulk quality controlled?

Materials, measurements, construction, trims and finishing are checked against the approved sample and specification.

How long does sample development take?

Sample development typically takes 15 days after the specification, materials and artwork are reviewed. Complex designs or custom-developed materials may require additional time; the final schedule is confirmed in the quotation.

How long does bulk production take?

Bulk production typically takes 25–35 days after sample approval and production details are confirmed. The final schedule depends on the design, materials, processes and order quantity and is confirmed in the quotation.

What to include in your brief

Share reference images or a tech pack, target quantity, fabric or GSM, colour count, size range, artwork, labels, packaging, destination and required delivery date.